Cold Storage Facility, Hazleton PA

Project: Cold Storage Facility,  Humboldt Industrial Park, Hazleton PA

 

Estimated Cost: 50 Million

Details: A design engineered 34 acre site and construction of a 214,800sf freezer distribution warehouse including: 144,000sf of -20/+35 temperature controlled rooms, 28,000sf truck docks, 12,700sf rail docks, 29,300sf office space, and 20,000 pallet positioning.

 

 Construction Management:

                                      United Insulated Structures Corp.

                                      5430 St. Charles Road

                                      Berkeley, Il 60163

                                               

Services: United Inspection Services provided complete quality control testing and inspecting for this project including, geotechnical investigation and mine study with foundation recommendations and paving design. United Inspection Services also provided all soils, concrete, masonry, and asphalt paving inspections.

 

UIS Contract total: $115,000

Result: The project was completed as scheduled.